The Create Baseline: Single Baseline section appears.
On the top right the Cancel, Back, Finish buttons appear.
The Baseline Name field is empty.
In the Baseline Interval section, Snapshot Range is selected.
The Change Chart Time Period navigation tree is collapsed.
In the Select Time Period section, the Period Start Time option shows Feb 5 2009 3:40:16 PM PST. It is not selected. The Period End Time option shows Mar 5 2009 3:50:18 PM PST. This option is selected.
A chart shows active sessions on the y-axis. The values range from 0 to 2.232. The x-axis shows hours of day, shown in 1-hour intervals, ranging from 2:20 p.m. to 3:50 p.m.
The Time Range option is not selected.
The Start Time is Feb 5 2009 at 3:40 p.m. The End Time is Feb 5 2009 at 3:50 p.m.
End of description.